Peri-pelvic post-operative support assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11304455
SERIAL NO

17495577

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A support assembly (100) for supporting a transverse incision site (420) of a user (101) includes an assembly body (106) and a first assembly arm (102). The assembly body (106) is configured to encircle an abdomen (107) of the user (101). The assembly body (106) includes a pelvic support layer (214) that is configured to provide a transverse supportive force to the transverse incision site (420) of the user (101). The first assembly arm (102) is coupled to the pelvic support layer (214). The first assembly arm (102) is configured to adjust the transverse supportive force relative to the user (101). The first assembly arm (102) has a first arm end (403) that is detachably fastenable to the assembly body (106). The first arm end (403) includes a first arm fastener (304) that detachably fastens the first assembly arm (102).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BROOKS CATHERINESOLANA BEACH CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brooks, Catherine Solana Beach, US 4 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00