Ejector-enhanced heat recovery refrigeration system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11300327
APP PUB NO 20190118618A1
SERIAL NO

16094345

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refrigerated transport system (20) comprises: an engine (30). A vapor compression system (50) comprises: a compressor (40) for compressing a flow of a refrigerant; a first heat exchanger (60) along a refrigerant flowpath (52) of the refrigerant; and a second heat exchanger (66) along the refrigerant flowpath of the refrigerant. A heat recovery system (56) has: a first heat exchanger (110) for transferring heat from the engine to a heat recovery fluid along a heat recovery flowpath (58); and a second heat exchanger (112; 63) along the heat recovery flowpath. The heat recovery system second heat exchanger and the vapor compression system first heat exchanger are respective portions of a shared tube/fin package.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARRIER CORPORATIONPALM BEACH GARDENS FL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cogswell, Frederick J Glastonbury, US 39 529
Elsherbini, Abdelrahman I Windsor, US 8 15
Verma, Parmesh South Windsor, US 122 950

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 12, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 12, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 12, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00