Modified calcium aluminate compound and production method therefor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11299398
APP PUB NO 20210188653A1
SERIAL NO

16076125

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a novel method for producing a calcium aluminate compound having a modified surface. The present invention provides: a method for producing a modified calcium aluminate compound characterized by irradiating a calcium aluminate compound dispersed in an organic dispersion medium with a femtosecond laser, thereby modifying the surface of the calcium aluminate compound; and a modified calcium aluminate compound characterized by being obtained by this method and having at least one of an OH group, a CO group, a CH group, and an NH group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEW-TECH INCADVANCED CHEMICAL TECHNOLOGY CENTER IN KYOTO #501 105 JIBUCHO FUSHIMI-KU KYOTO-SHI KYOTO 612-8374

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hikazudani, Susumu Osaka, JP 39 154
Hirano, Minami Kyoto, JP 1 0
Hirao, Kazuyuki Kyoto, JP 37 241
Shono, Emi Osaka, JP 15 4
Visbal, Heidy Kyoto, JP 8 37
Yoshida, Satoshi Osaka, JP 330 2967

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 12, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 12, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 12, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00