Multilayer ceramic electronic component and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11295896
APP PUB NO 20200135400A1
SERIAL NO

16665281

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer ceramic electronic component includes an element body, a via-hole electrode, and a terminal electrode. The element body includes internal electrode layers and insulation layers alternately laminated in a lamination direction. The via-hole electrode penetrates from an upper surface of the element body thereinto and is connected with at least one of the internal electrode layers. The terminal electrode is formed on the upper surface of the element body and connected with the via-hole electrode. The via-hole electrode is embedded in a via hole formed on the element body so that a predetermined clearance space is formed in the via hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TDK CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwanaga, Daisuke Tokyo, JP 16 142
Nakata, Hisashi Tokyo, JP 19 211
Okai, Keisuke Tokyo, JP 12 95
Sakurai, Toshio Tokyo, JP 49 460
Shibasaki, Tomoya Tokyo, JP 8 48
Tanaka, Hirobumi Tokyo, JP 26 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 5, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 5, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00