Method for producing aldehyde and method for producing alcohol

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11292752
APP PUB NO 20200270186A1
SERIAL NO

16871098

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for producing an aldehyde by a hydroformylation reaction of reacting an olefin with hydrogen and carbon monoxide in the presence of a Group 8 to 10 metal-phosphine complex catalyst, including the following steps (1) and (2): (1) a step of oxidizing by withdrawing a reaction solution having accumulated therein a high-boiling-point byproduct from a reaction zone and bringing the withdrawn reaction solution into contact with an oxygen-containing gas, and (2) a step of, after the step (1), mixing a poor solvent and hydrogen with the reaction solution, then crystallizing the Group 8 to 10 metal-phosphine complex catalyst by crystallization, and recovering the crystallized complex catalyst from the reaction solution.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI CHEMICAL CORPORATION1-1 MARUNOUCHI 1-CHOME CHIYODA-KU TOKYO 1008251 ?1008251

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sato, Takashi Tokyo, JP 973 9680
Tanaka, Yoshiyuki Tokyo, JP 290 4679

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 5, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 5, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00