Method for producing H-shaped steel

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11292039
APP PUB NO 20200282438A1
SERIAL NO

16648474

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A large-size H-shaped steel product is produced by performing a rough rolling step including an edging rolling step of rolling and shaping a material to be rolled into a predetermined almost dog-bone shape, and a flat rolling step of performing rolling of a web part by rotating the material to be rolled after completion of the edging rolling step by 90° or 270°, upper and lower caliber rolls of at least one caliber of calibers configured to perform the flat rolling step include recessed parts configured to form a raised part at a middle of a web part of the material to be rolled, the recessed parts being provided at roll barrel length middle parts of the upper and lower caliber rolls.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATION6-1 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008071 ?1008071

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamashita, Hiroshi Tokyo, JP 467 5965

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 5, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 5, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00