Grill apparatus and firebox assembly for use in a grill

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11291334
APP PUB NO 20210228026A1
SERIAL NO

16775919

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A grill apparatus includes a bottom portion, a lid portion, a firebox and an ash bucket. The lid portion is coupled to the bottom portion forming a cooking chamber. The bottom portion receives the firebox. A support structure of the firebox rests on an inner surface of the bottom portion. An inner surface of the bottom port, the support structure of the firebox and a firebox lower opening define a first air path from a lower portion of the cooking chamber to a heat chamber. The ash bucket includes an air vent extending from a base of the ash bucket base into an internal ash receptacle and has an upper vent aperture with a vent cover connected to the air vent. The cover is disposed over an upper vent aperture to further define the first air path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEWAGE PRODUCTS INC1190 CALEDONIA ROAD TORONTO ONTARIO M6A 2W5

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bahreinian, Hessam Toronto, CA 4 8
Vandenham, Robert Woodbridge, CA 54 438

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 5, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 5, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00