Multi-port converter structure for DC/DC power conversion

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11289906
APP PUB NO 20210036515A1
SERIAL NO

16994553

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A module for interconnecting a pair of DC sources or a pair of DC loads into a DC bus includes: a first port for each source or load; a switching cell for each first port, each cell having a pair of terminals and a switching node; a second port operatively connected to the DC bus and having a pair of terminals, one of the pair of terminals of the second port being connected to one of the terminals of one of the cells and the other of the pair of terminals of the second port being connected to one of the terminals of the other of the cells; and a filter inductor connected between the switching nodes of the cells. Systems including the module and methods utilizing the system are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE GOVERNING COUNCIL OF THE UNIVERSITY OF TORONTOTORONTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, Yuanzheng Toronto, CA 3 21
Iunnissi, Sebastian Rivera Toronto, CA 2 15
Lehn, Peter Waldemar Toronto, CA 13 106
Ranjram, Mike Kavian Toronto, CA 5 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 29, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 29, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00