Board-to-board interconnect apparatus including microstrip circuits connected by a waveguide, wherein a bandwidth of a frequency band is adjustable

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11289788
APP PUB NO 20200274222A1
SERIAL NO

16874213

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a chip-to-chip interface using a microstrip circuit and a dielectric waveguide. A board-to-board interconnection device, according to one embodiment of the present invention, comprises: a waveguide which has a metal cladding and transmits a signal from a transmitter-side board to a receiver-side board; and a microstrip circuit which is connected to the waveguide and has a microstrip-to-waveguide transition (MWT), wherein the microstrip circuit matches a microstrip line and the waveguide, adjusts the bandwidth of a predetermined first frequency band among the frequency bands of the signal, and provides same to the receiver.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POINT2 TECHNOLOGY INC(MUNJI-DONG KAIST) 210-HO BUSOCK1-DONG 193 MUNJI-RO YUSEONG-GU DAEJEON 34051

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bae, Hyeon Min Daejeon, KR 39 228
Jin, Huxian Daejeon, KR 4 31
Song, Ha Il Daejeon, KR 9 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 29, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 29, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00