Co-integrated high voltage (HV) and medium voltage (MV) field effect transistors

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11289598
APP PUB NO 20210328055A1
SERIAL NO

16849560

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to semiconductor structures and, more particularly, to co-integrated high voltage and medium voltage devices and methods of manufacture. The structure includes a substrate having a semiconductor on insulator (SOI) region and a bulk region; and a first device formed on the bulk region, the first device having a first gate dielectric layer and a second gate dielectric layer surrounding the first dielectric layer, and a thickness of the first gate dielectric layer and the second gate dielectric layer being greater than a thickness of an insulator layer of the SOI region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GLOBALFOUNDRIES DRESDEN MODULE ONE LIMITED LIABILITY COMPANY & CO KGWILSCHDORFER LANDSTRASSE 101 DRESDEN 01109

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baars, Peter Dresden, DE 133 1340
Kammler, Thorsten E Dresden, DE 4 0
Wu, Nan Dresden, DE 196 805

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 29, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 29, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00