Intercooler for nuclear facility

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11289217
APP PUB NO 20200075184A1
SERIAL NO

16393286

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plurality of heat transfer pipes; a first header and a second header to which both ends of each of the heat transfer pipes that are disposed in parallel are fixed, respectively; a plurality of plate-shaped fins through which each of the heat transfer pipes is penetrated and that are provided at intervals in a direction in which the heat transfer pipes extend between the first header and the second header; and a fan that circulates an airflow between the plate-shaped fins are included. The first header and the second header are formed to be sectioned into multiple rows, the heat transfer pipes are disposed densely in an sectioned area of the first header and the second header, and the heat transfer pipes are disposed sparsely in an area between the sectioned areas of the first header and the second header.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTDTOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hara, Nobuhide Tokyo, JP 36 34
Morita, Ryo Tokyo, JP 15 33
Ogata, Fumikazu Tokyo, JP 4 5
Tanimoto, Koichi Tokyo, JP 57 78
Yoshioka, Masahiro Tokyo, JP 110 1664

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 29, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 29, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00