Fast utility access device and method of use thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11287239
SERIAL NO

16937113

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fast utility access device (FUAD) is provided that includes one or more casings, each of the one or more casings collectively defining a bore, and a core of a highly exothermic composition contained in the bore and surrounded by a thermally insulating inner liner, the highly exothermic composition ignitable to create a post-ignition temperature of between 500° C. and 4000° C. A method is also provided for breaching a target and includes contacting the inventive access device with a breaching target substrate, thermally coupling at least one reaction initiator to the highly exothermic composition, triggering the at least one reaction initiator thereby igniting the highly exothermic composition, and allowing the highly exothermic composition to achieve a post-ignition temperature sufficient to melt the breaching target substrate, forming a hole therethrough.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF THE ARMYWASHINGTON DC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bonavito, Nino L Perry Hall, US 3 2
Domanico, Joseph A Bel Air, US 10 17
Gardner, Warren L Bel Air, US 2 1
Kauzlarich, Michael F Edgewood, US 6 2
Polk, Amee L Havre de Grace, US 4 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 29, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 29, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00