Interconnection of subsea pipelines and structures

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11287062
APP PUB NO 20200318759A1
SERIAL NO

16955570

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a method of interconnecting a conduit and a plurality of subsea structures. The method comprises providing a first manifold header in-line of the conduit, where the first manifold header has at least one valve installed therein, A portion of the conduit is lowered to the sea bed such that the first manifold header is engaged with a first subsea structure, and a further portion of the conduit is lowered to the sea bed. A second manifold header, having at least one valve installed therein, is provided in-line of the conduit and engaged with a second subsea structure. The length of conduit provided on the sea bed between the first subsea structure and the second subsea structure is significantly greater than the distance between the first and second subsea structures.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EQUINOR ENERGY AS4035 STAVANGER

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ilstad, Håvar Trondheim, NO 5 13
Levold, Erik Trondheim, NO 6 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 29, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 29, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00