Compositions, films comprising cured products of the same, stacked structures comprising the films, and display devices

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11286350
APP PUB NO 20200181331A1
SERIAL NO

16661650

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composition includes a copolymer including a specific structural unit and a solvent, wherein the copolymer further includes a specific functional group at at least one terminal end. A film may include a cured product of the composition. A stacked structure may include a substrate film and the film on at least one surface of the substrate film. A display device may include the stacked structure. An electronic device may include the display device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD416 MAETAN-DONG YEONGTONG-GU SUWON-SI GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Androsov, Dmitry Suwon-si, KR 35 74
Han, Jung Im Yongin-si, KR 25 125
Jung, Won Cheol Seoul, KR 38 174
Kim, Ginam Seongnam-si, KR 27 27
Kong, Hye Young Uijeongbu-si, KR 24 71
Park, Byung Ha Yongin-si, KR 34 168

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 29, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 29, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00