Method for optimizing the production of a rotor spinning machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11280029
APP PUB NO 20200131674A1
SERIAL NO

16728005

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method optimizes production of a rotor spinning machine having a plurality of identical spinning units, with each spinning unit having a spinning rotor driven by a rotor drive at a rotor speed to produce yarn at a delivery speed. A permissible range with a minimum delivery speed and a maximum delivery speed for the delivery speed of the spinning units is specified. Operation of the spinning units is started with a starting delivery speed within the permissible range. Current production capacity of the spinning units or the rotor spinning machine is continuously calculated. Current delivery speed of the yarn is regulated as a function of the current production capacity in such a manner that a maximum production capacity is achieved. A rotor spinning machine in accordance with method is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SPINDELFABRIK SUESSEN GMBHDONZDORFER STR 4 SUESSEN 73079

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Stephan, Adalbert Beilngries/Paulushofen, DE 45 113

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00