Ejector device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11274680
APP PUB NO 20190331139A1
SERIAL NO

16476931

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ejector device (1), e.g., for pumping a gas using a liquid motive fluid, has an injector portion (100), and a diffuser portion (50), the injector portion (100) being arranged for injecting a flow of motive fluid from a motive fluid inlet (10) into an inlet section (52) of the diffuser portion (50) thereby to draw a suction fluid from a suction fluid inlet (20) into the inlet section (52) of the diffuser portion (50). The injector portion (100) includes a flow-modifying arrangement with at least one rotational deflector element (104), e.g., three vanes (104V1, 104V2, 104V3) each at a desired twist angle, constructed and arranged to deflect motive fluid into a helical path as it moves over or through the rotational deflector element (104), and at least one baffle element (103), e.g., a baffle plate (103), downstream of the rotational deflector element (104).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRANSVAC SYSTEMS LIMITEDALFRETON DERBYSHIRE DE55 4RH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
More, Thomas Peter Alfreton, GB 1 3
Roberts, Jacob Thomas Alfreton, GB 2 3
Short, Gary Anthony Alfreton, GB 3 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00