Lift hole forming device for concrete products

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11274447
APP PUB NO 20210254341A1
SERIAL NO

16907572

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A continuous length of spring-steel material of a substantially round cross-section formed with a bent section comprising a radius corresponding to an outer diameter of the pipe. A hook section is combined at one end of the continuous length of spring-steel material where the hook is formed to grab one of the wires of the cage to hold the pipe in position. A lateral leg is positioned at the other end of the continuous length of spring-steel material and is formed to grab another one of the wires of the cage to the hold the pipe in position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAWKEYEPEDERSHAAB CONCRETE TECHNOLOGIES INC120 SOUTH CENTRAL AVENUE CLAYTON MO 63105

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McDonald, Mike Ludington, US 3 42
Moehle, Bryan Mediapolis, US 1 0
Schmidgall, Aaron Mediapolis, US 1 0
Strabala, Dave Mediapolis, US 4 6
Wright, James Ludington, US 156 17157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00