Plants having increased tolerance to herbicides

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11274313
APP PUB NO 20150252379A1
SERIAL NO

13994374

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention refers to a method for controlling undesired vegetation at a plant cultivation site, the method comprising the steps of providing, at said site, a plant that comprises at least one nucleic acid comprising a nucleotide sequence encoding a mutated protoporphyrinogen oxidase (PPO) which is resistant or tolerant to a benzoxazinone-derivative herbicide by applying to said site an effective amount of said herbicide. The invention further refers to plants comprising mutated PPO enzymes having a substitution at a position corresponding to position Arg128 of SEQ ID NO:2 and an amino acid substitution at a position corresponding to position Phe420 of SEQ ID NO:2, and methods of obtaining such plants.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF AGRO B V6811 AH ARNHEM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aponte, Raphael Mannheim, DE 42 123
Hutzler, Johannes Waldsee, DE 56 130
Lerchl, Jens Golm, DE 82 600
Mankin, S Luke Raleigh, US 8 15
Mietzner, Thomas Annweiler, DE 47 85
Simon, Anja Weinheim, DE 55 291
Tresch, Stefan Kirchheim, DE 73 140
Witschel, Matthias Bad Duerkheim, DE 208 953

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00