Refuse vehicle with electric lift

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11273978
APP PUB NO 20200346858A1
SERIAL NO

16851235

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refuse vehicle includes a chassis, multiple tractive elements, a reach assembly, and a fully-electric lift assembly. The multiple tractive elements are coupled with the chassis and support the refuse vehicle. The reach assembly is coupled with the refuse vehicle. The fully-electric lift assembly is coupled with the reach assembly and includes a track, a carrier assembly, an electric motor, and a drive member. The track includes a straight portion and a curved portion. The track includes multiple channels that extend along an entire length of a path of the track and multiple engagement members. The carrier assembly is configured to move along the path of the track. The electric motor is fixedly coupled with the carrier assembly and drives a driveshaft. The drive member is rotatably fixedly coupled with the driveshaft and engages the multiple engagement members to drive the carrier assembly to ascend or descend along the track.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSHKOSH CORPORATIONP O BOX 2566 2307 OREGON STREET OSHKOSH WI 54902-2566

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buege, Wallace Oshkosh, US 32 563
Kappers, Jerrod Oshkosh, US 90 452
Kotloski, Andrew Oshkosh, US 46 1653
Rocholl, Joshua D Rochester, US 136 2350
Schimke, Martin Oshkosh, US 26 1894

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00