Military vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11273804
APP PUB NO 20210362697A1
SERIAL NO

17398511

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A military vehicle includes a passenger capsule, a front module coupled to a front end of the passenger capsule, and a rear module coupled to a rear end of the passenger capsule. The passenger capsule has a frame rail-less monocoque hull structure. The front module includes a first longitudinal frame member coupled to the front end of the passenger capsule proximate a first side thereof, a second longitudinal frame member coupled to the front end of the passenger capsule proximate an opposing second side thereof, and an underbody support structure coupled to the front end of the passenger capsule, the first longitudinal frame member, and the second longitudinal frame member. The underbody support structure is positioned beneath the first longitudinal frame member and the second longitudinal frame member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSHKOSH DEFENSE LLC2307 OREGON STREET P O BOX 2566 WASHINGTON DC 20007-5109

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gander, Jesse Oshkosh, US 46 1710
Holda, Joseph Oshkosh, US 19 1050
McGraw, David Oshkosh, US 17 643
Messina, Rob Oshkosh, US 23 1204
Pelko, Dave Oshkosh, US 17 643
Peotter, Michael Oshkosh, US 17 643
Reineking, Jerry Oshkosh, US 17 643
Schmiedel, Gary Oshkosh, US 26 2770
Schulte, Kent Oshkosh, US 17 643
Seefeldt, Anthony Oshkosh, US 17 643
Seffernick, Daniel R Oshkosh, US 22 708
Steinke, Jesse Oshkosh, US 21 698
Verhoff, Don Oshkosh, US 17 643
Wilkins, Brian Oshkosh, US 19 686
Yakes, Chris Oshkosh, US 20 1094

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00