Hybrid electrolyte design for titanium niobium oxide based lithium battery

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11271195
APP PUB NO 20210013486A1
SERIAL NO

16505335

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one or more embodiments, a lithium-ion battery includes an anode including titanium niobium oxide (TNO) particles and solid electrolyte particles configured to form an interphase layer therebetween, a cathode including an active material, electronic conductor, and a non-solid electrolyte; and an ionically conductive and liquid-impermeable solid electrolyte separator. The solid electrolyte separator is in direct contact with and between the anode and cathode, and is configured to prevent reduction of the non-solid electrolyte by isolating the non-solid electrolyte from the TNO particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLCFAIRLANE PLAZA SOUTH SUITE 800 330 TOWN CENTER DRIVE DEARBORN MI 48126

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anandan, Venkataramani Farmington Hills, US 32 262

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00