Fuel assembly design concept and mixed cycle length operation method for long cycle length pressurized water reactor operation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11270804
APP PUB NO 20190279780A1
SERIAL NO

16294967

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a pressurized water reactor operation method, a fuel assembly including first fuel rods that operates for a preset first operation time and second fuel rods that operates for a second operation time longer than the first operation time is prepared. An operation schedule of a pressurized water reactor is created by mixing the first operation time of the first fuel rods and the second operation time of the second fuel rods. The pressurized water reactor operates by repeating the operation schedule.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ULSAN NATIONAL INSTITUTE OF SCIENCE AND TECHNOLOGY50 UNIST-GIL EONYANG-EUP ULJU-GUN ULSAN 44919

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choe, Jiwon Ulsan, KR 1 0
Choi, Soo Young Ulsan, KR 263 13902
Jang, Jaerim Ulsan, KR 1 0
Jeong, Eun Ulsan, KR 2 5
Lee, Deokjung Ulsan, KR 1 0
Park, Jinsu Ulsan, KR 33 107
Zhang, Peng Ulsan, KR 846 8792

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00