On-board fabrication of pipe-in-pipe assemblies

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11267542
APP PUB NO 20210078679A1
SERIAL NO

16772411

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pipelay vessel having two pipe string manufacturing lines and a firing line, wherein the pipe string manufacturing lines are designed for simultaneously handling two different pipe outer diameters for use as an inner pipe and an outer pipe respectively. Further, the vessel has a pipe-in-pipe assembly workstation for assembling the inner pipe and the outer pipe in a pipe-in-pipe configuration. The vessel is designed with a lay-out which allows for producing offshore pipe-in-pipe strings from single joints, wherein available space is optimally used and pipe-in-pipe strings can be produced safely offshore.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANGHAI ZHENHUA HEAVY INDUSTRIES CO LTD200125 NO 3470 PUDONG SOUTH ROAD PUDONG NEW AREA SHANGHAI SHANGHAI CITY SHANGHAI CITY 200125

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daney, Laurent Sharjah, AE 3 4
Fenini, Alessandro Sharjah, AE 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00