Port structure of containment apparatus, kit for creating port of containment apparatus, and containment apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11267143
APP PUB NO 20190084166A1
SERIAL NO

16086325

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A port structure of a containment apparatus is capable of providing a highly reliable port by means of a structure with which a port can be formed in any size at any position and high airtightness thereof can be maintained. The port structure has: a port formation hole that is formed in a transparent synthetic resin sheet defining at least a part of a chamber; an inner ring member disposed on the inner surface side of the port formation hole; an outer ring member disposed on the outer surface side of the port formation hole; and a fastening member that joins the inner ring member and the outer ring member to each other while having a rim portion of the port formation hole held therebetween.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NARA MACHINERY CO LTDTOKYO 140-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arizono, Kenichi Tokyo, JP 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00