Debris control apparatus for cutting machines

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11267092
APP PUB NO 20170282318A1
SERIAL NO

15438275

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A debris control apparatus comprising a debris control enclosure, the enclosure further comprising a vacuum opening in the enclosure. The vacuum opening being sized, shaped and positioned to receiving a vacuum conduit, connected to a vacuum source, for extracting the debris from the enclosure. The debris control apparatus further comprising a mounting assembly for mounting the enclosure to a machine, such that, during operation, the enclosure moves along the work material as the cutting tool moves along the work material, the enclosure being mounted independent of movement of the cutting tool in and out of the work material. The mounting assembly comprises a depth adjuster for adjusting the operating depth of the enclosure. The depth of the enclosure can be adjusted such that the debris will be contained in the enclosure during operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEPURNY MARK PBRADFORD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chepurny, Mark P Bradford, CA 16 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00