Copper-based brazing material and use of the brazing material

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11267082
APP PUB NO 20200198066A1
SERIAL NO

16802731

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A copper-based brazing material comprises an alloy having nickel in a proportion of from 20 to 35 percent by weight, zinc in a proportion of from 5 to 20 percent by weight, manganese in a proportion of from 5 to 20 percent by weight, chromium in a proportion of from 1 to 10 percent by weight, silicon in a proportion of from 0.1 to 5 percent by weight and molybdenum in a proportion of from 0 to 7 percent by weight, each based on the total weight of the alloy, and the remainder being copper and unavoidable impurities. The alloy is in particular free from boron, phosphorus and lead. The brazing material can be used for induction brazing of components made of iron materials for exhaust systems in motor vehicles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FAURECIA EMISSIONS CONTROL TECHNOLOGIES GERMANY GMBHBIBERBACHSTRASSE 9 AUGSBURG 86154

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burger, Simon Augsburg, DE 4 22
Muhammad, Yasir Gablingen, DE 5 11
Steigerwald, Marc Augsburg, DE 2 3
Wieser, Helmut Aichach, DE 5 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00