Transition between a waveguide and a substrate integrated waveguide, where the transition includes a main body formed by symmetrical halves

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11264689
APP PUB NO 20210265715A1
SERIAL NO

16797930

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A broadband transition coupling for transition between a waveguide and a printed circuit board with a substrate integrated waveguide is disclosed. The broadband transition coupling comprises a main body that encompasses an air-filled waveguide section and a transition section. The air-filled waveguide section comprises a first interface for the waveguide. The transition section provides a second interface for the printed circuit board. The transition section continuously tapers along the second interface in order to reduce a height of the transition section for transition coupling with the printed circuit board. Further, the present disclosure relates to a broadband system for processing electromagnetic signals.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROHDE & SCHWARZ GMBH & CO KGMUNICH GERMANY MUNICH BAVARIA

International Classification(s)

loading....
  • 2020 Application Filing Year
  • H01P Class
  • 633 Applications Filed
  • 471 Patents Issued To-Date
  • 74.41 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances2020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sporer, Michael Munich, DE 14 799

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • H01P Class
  • 0 % this patent is cited more than
  • 3 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges55915401 - 100255075100125150175200225250275300325350375400425450475500525550575600

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2033