Optical fiber connection

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11262501
APP PUB NO 20170357051A1
SERIAL NO

15532870

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Optical fiber connections and their applications in downhole assemblies are described herein. The downhole assembly includes a well completion element with an end that couples with a corresponding well completion element. An optical fiber extends along at least a portion of the well completion element and transmits an optical signal using a first mode. The well completion element includes an optical fiber connector that is coupled to the optical fiber. The connector also includes a mode converter that receives the optical signal from the optical fiber and converts the optical signal from the first mode to a second larger mode. This second larger mode may be more robustly communicated to a corresponding optical fiber connector affixed to the corresponding well completion element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHLUMBERGER TECHNOLOGY CORPORATION300 SCHLUMBERGER DRIVE SUGAR LAND TX 77478

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Auzerais, Francois M Boston, US 30 748
Bulu, Irfan Somerville, US 13 25
Graham, Robert Abu Dhabi, AE 53 1993
Sadek, Mohamed Aly Missouri City, US 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00