Refrigeration cycle apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11262106
APP PUB NO 20190195539A1
SERIAL NO

16321281

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a refrigeration cycle apparatus capable of achieving an improvement in heat exchange performance during a heating operation and during a cooling operation, while suppressing increases in manufacturing cost and volume required for packaging. The outdoor heat exchanger and the outdoor heat exchanger are connected in parallel to the indoor heat exchanger via the branch portion. The flow path switching device includes a first port, a second port, and a third port. The first port is connected with a third refrigerant flow path. The second port is connected with the outdoor heat exchanger. The third port is connected with a fourth refrigerant flow path. The second port is configured to switch between a state in which the second port is connected to the first port and a state in which the second port is connected to the third port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akaiwa, Ryota Tokyo, JP 26 79
Higashiiue, Shinya Tokyo, JP 64 395

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00