Hydrogen gas storage tank

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11262025
APP PUB NO 20210131610A1
SERIAL NO

16675610

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrogen gas storage tank includes a body including a steel bulk region and a passivating metal oxide layer adjacent to the steel bulk region, the oxide layer comprising a number of metal oxide molecules, all having a morphology, wherein at least about 51 wt. % of the number of metal oxide molecules are Fe2O3 molecules having morphologies of (012), (001), and/or (110) surface facets such that the oxide layer is configured to lower hydrogen adsorption into the steel bulk region by at least 25% compared to a steel bulk region free from the passivating metal oxide layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHSTUTTGART GERMANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Craig, Nathan Santa Clara, US 44 44
Kim, Soo Cambridge, US 128 99
Kuntz, Matthias Stuttgart, DE 67 1201
Mailoa, Jonathan Cambridge, US 64 63
Marusczyk, Anika Stuttgart, DE 10 38
Muehleder, Friedrich Muehlacker, DE 10 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00