Pull start assist device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11261837
SERIAL NO

17188054

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pull start assist device may include a frame with a base and a longitudinal member. The longitudinal member may include a first pivot axis and a second pivot axis displaced from the first pivot axis. The device may also include a pedal arm with a pedal on a first end and a second end pivotally coupled to the first pivot axis of the longitudinal member. A swing arm may be provided with a handle receiver on a first end and a second end pivotally coupled to the second pivot axis of the longitudinal member. A connection link maybe used to connect the swing arm and the pedal arm, whereby a pull start handle of a powered tool may be supported by the handle receiver and the pedal displaced by the foot of a user, actuating the swing arm and starting the powered tool.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CAPRIOTTI CHRISCLOVIS CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Capriotti, Chris Clovis, US 3 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00