Renewable blended syngas from a plasma-based system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11261393
APP PUB NO 20130320679A1
SERIAL NO

13825013

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system for cost-effectively converting a feedstock using thermal plasma, or other styles of gassifiers, into an energy transfer system using a blended syngas. The feedstock is any organic material or fossil fuel to generate a syngas. The syngas is blended with any fuel of a higher thermal content (BTU) level, such as natural gas. The blended syngas high thermal content fuel can be used in any energy transfer device such as a boiler for simple cycle Rankine systems, an internal combustion engine generator, or a combined cycle turbine generator system. The quality of the high thermal content fuel is monitored using a thermal content monitoring feedback system and a quenching arrangement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEAT IP HOLDCO LLCC/O KZMD ACQUISITION LLP 12 CARDEN PLACE ABERDEEN AB101UR

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Juranitch, James C Ft. Lauderdale, US 42 92

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00