Apparatus, system, and method for producing a sealant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11260354
APP PUB NO 20180154322A1
SERIAL NO

15371043

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein is a method for producing a sealant. The method includes mixing a first material with a second material at a manufacturing site to produce the sealant. The method also includes applying x-ray energy to the sealant at the manufacturing site. The method includes measuring an amount of fluorescence emitted from the sealant in response to applying the x-ray energy. The method also includes calculating a mix ratio of the first and second materials of the sealant based on the amount of fluorescence. The method includes determining whether the mix ratio is within a predetermined mix ratio range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY100 N RIVERSIDE CHICAGO IL 60606

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akwari, Nelson N Summerville, US 4 3
DeForest, John Bothell, US 2 0
Dickerson, Sarah Bothell, US 5 0
Erickson, Jeffrey Lakewood, US 12 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00