Control device and corresponding production method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11258380
APP PUB NO 20180294749A1
SERIAL NO

15948680

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a control device for mechanically controlling a component. The control device may have a device housing including a motor accommodating space in which an electric motor is arranged. The electric motor may include a motor housing having a stator and a rotor, the rotor including a rotor shaft. The method may include selecting an electric motor from a plurality of electric motors each suitable for a specified application. Each of the plurality of electric motors may have a different respective axial motor length and may have a same respective motor cross section. Further, the method may include adapting the motor accommodating space to the respective axial motor length of the selected electric motor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAHLE INTERNATIONAL GMBHSTUTTGART GERMANY STUTTGART BADEN-WURTTEMBERG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Makarow, Eugen Ludwigsburg, DE 11 2
Salfeld, Edgar Lichtenwald, DE 9 5
Wetzel, Florian Baltmannsweiler, DE 16 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00