High frequency medium voltage drive system for high speed machine applications

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11258370
SERIAL NO

16205879

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one aspect, a medium voltage power converter includes a plurality of slices each having: a transformer including a plurality of primary windings to couple to a utility source of input power and a plurality of secondary windings; and a plurality of power cubes coupled to the plurality of secondary windings, each of the plurality of power cubes comprising a low frequency front end stage, a DC link, and a high frequency silicon carbide (SiC) inverter stage to couple to a high frequency load or to a high speed machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECO-WESTINGHOUSE MOTOR COMPANY5100 NORTH IH-35 ROUND ROCK TX 78681

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Edwards, Ryan Round Rock, US 24 658
Guedes-Pinto, Paulo Round Rock, US 49 398
Ledezma, Enrique Austin, US 21 587
Palle, Bhaskara Round Rock, US 6 33
Pipho, Randall Leander, US 11 228
Skorcz, Alex Cedar Park, US 19 569

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00