Lighting system with ballistic impact resistance

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11255516
SERIAL NO

17101620

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A luminaire that can resist the shock associated with a ballistics event and continue to operate. The luminaire has a base formed from high ductility aluminum. An illumination source, such as a light emitting diode array, is secured to a support of the base. A lens having a gasket is positioned over the illumination source and secured thereto with a clamp. A ballistic shield having a dual gasket is coupled to the clamp by a bezel positioned over the ballistic shield and secured to the clamp. The gaskets extending around the peripheral edges of the lens and the shield cooperate with the highly ductile aluminum base to reduce the transmission of any shock associated with a ballistic event to the illumination source and associated electronics.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
M3 INNOVATION LLC727 E WASHINGTON ST SYRACUSE NY 13210

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Casper, Joseph R Baldwinsville, US 52 313
Nolan, Christopher D Camillus, US 52 313

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00