Process for manufacturing boron nitride agglomerates

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11254820
APP PUB NO 20200087517A1
SERIAL NO

16693178

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are methods for forming boron nitride-containing aggregates that exhibit improved wear by attrition, and resulting filled polymers that exhibit significantly improved thermal conductivity. The boron nitride-containing aggregates are prepared according to a method that includes wet granulating boron nitride powder with a granulation solution to form wet boron nitride-containing granules; and drying the wet boron nitride-containing granules to cause evaporation of solvent in the granulation solution, thereby forming boron nitride-containing granules. Sintering achieves the desired boron nitride-containing aggregates.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAINT-GOBAIN CERAMICS & PLASTICS INCWORCESTER MA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bahon, Elodie Salon de Provence, FR 3 3
Judas, Pierre-Loup Saint-Germain-au-Mont-D'Or, FR 2 2
Nahas, Nabil Mougins, FR 28 195

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00