Lightweight conductive mortar material, preparation method therefor and method of using thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11254614
APP PUB NO 20200308053A1
SERIAL NO

16644508

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are a lightweight conductive mortar material, a preparation method therefor and use thereof. The lightweight conductive mortar material includes the following components in parts by weight: 100 parts of cement, 25 parts to 60 parts of a conductive porous lightweight aggregate loaded with a modified agar gel, and 30 parts to 45 parts of water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOUTH CHINA UNIVERSITY OF TECHNOLOGY510640 NO FIVE 381 MOUNTAIN ROAD GUANGZHOU GUANGDONG TIANHE DISTRICT GUANGZHOU CITY GUANGDONG PROVINCE 510640

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Wenhao Guangdong, CN 3 1
Hu, Jie Guangdong, CN 208 643
Li, Fangxian Guangdong, CN 1 0
Ma, Yuwei Guangdong, CN 3 0
Wei, Jiangxiong Guangdong, CN 3 0
Yu, Qijun Guangdong, CN 4 38
Zhang, Jiyao Guangdong, CN 14 47
Zhang, Zhangmin Guangdong, CN 1 0
Zhu, Yangyang Guangdong, CN 5 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00