Vehicle rigid axle and method of manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11254163
SERIAL NO

16779619

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle rigid axle with an axle beam, at the ends of which axle journals or wheel carriers, are arranged, and trailing arms rigidly attached with a spring bracket for supporting an air-suspension bellow, and a method for manufacturing the vehicle rigid axle. An axle beam section extending between the trailing arms, a trailing arm adjoining the axle beam section and the spring bracket are formed by two shell elements connected to each other, which form a hollow body. In an embodiment, the spring bracket is formed by a lower shell element forming an axle beam section extending between the two trailing arms, and the spring bracket is arranged so that the air-suspension bellow mounted on the spring bracket is penetrated by the central longitudinal axis of the axle beam section. Two shell elements made of sheet metal are formed and joined together to form a hollow body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EBERT-CONSULTING GMBHCOLOGNE GERMANY COLOGNE NORTH RHINE-WESTPHALIA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ebert, Jorg Cologne, DE 9 150

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00