Non-orthogonal cube corner elements and arrays thereof made by end milling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11253933
APP PUB NO 20200038969A1
SERIAL NO

16485032

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A new technique for making cube corner elements that involves end milling is used in the fabrication of cube corner elements having non-orthogonal dihedral angles and dihedral angle errors, and arrays of such cube corner elements. A given optical face of a cube corner element may be a compound face with two constituent faces. In some cases, the constituent faces may be parallel and coplanar such that a given dihedral angle error pertains to the entire optical face, while in other cases, the two constituent faces may not be parallel, and may be associated with different dihedral angle errors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3M INNOVATIVE PROPERTIES COMPANYPO BOX 33427 ST PAUL MN 55133-3427

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ballen, Todd A Pt. Paul, US 26 314
Grinde, Christopher S Baldwin, US 3 0
Sewall, Nelson D Forest Lake, US 19 565
Smith, Kenneth L White Bear Lake, US 172 4321

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00