Medical transfer pad and production process thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11253412
SERIAL NO

17367435

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A medical transfer pad and a production process thereof including a transfer pad body, at least two square pockets arranged symmetrically up and down are disposed on a middle portion of the rear portion of the transfer pad body, and at least two tensile fabric webbing handles symmetrically spaced up and down are disposed on a rear portion of the transfer pad body. The transfer pad body includes a polymer nano-level columnar elastomer anti-skid layer, a first waterproof fiber cloth layer, a first waterproof fiber cloth layer, and a high-strength tear-resistant nylon webbing layer that are placed neatly from top to bottom and are stitched and reinforced by high-strength nylon thread. An upper surface of the first waterproof fiber cloth layer is sprayed with the polymer nano-level columnar elastomer anti-skid layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KEASY (XIAMEN) TECHNOLOGY CO LTD5H-5 BUILDING C1 NO 132 HUACHANG ROAD HULI DISTRICT XIAMEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Xu, Zhiyong Putian, CN 43 259

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00