Constant velocity joint

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11248660
APP PUB NO 20190309800A1
SERIAL NO

16374996

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A joint-center-fixed constant velocity joint configured to be provided in a vehicle includes an outer joint member, an inner joint member, a first ball, a second ball, and a cage. While a center of the first ball is moving to a position of the maximum use angle on an opening side from a joint center, a first open angle faces the opening side. While a center of the second ball is moving to a position of the maximum use angle on a bottom side from the joint center, a second open angle is not reversed from a state where the second open angle faces the bottom side to a state where the second open angle faces the opening side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JTEKT CORPORATION1-1 ASAHI-MACHI KARIYA-SHI AICHI 4488652 ?4488652

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikeo, Masahito Kariya, JP 7 5
Kashiwagi, Isashi Kariya, JP 15 42
Shinoda, Yoshitaka Nagakute, JP 6 3
Sugiura, Hideki Nagakute, JP 82 1396

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00