Jet engine, flying object, and operation method of jet engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11248562
APP PUB NO 20190032602A1
SERIAL NO

16071980

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A jet engine has an inlet 11 configured to introduce air, and a combustor 12 having a fuel injection port 30a that injects a fuel, and configured to combust the fuel injected from the fuel injection port 30a by using the air. The combustor 12 has a separation section 14 defining the air passage FA through which the air flows, between a rear end 15 of the inlet and the fuel injection port 30a. A plurality of turbulent flow generating sections (20;25) are arranged in the separation section 14 to makes the air flow turbulent. Each of the plurality of turbulent flow generating sections (20;25) contains a member (21;22;25B) which can restrain the turbulence of the air flow by moving or disappearing. It can be prevented that a high-pressure region reaches the inlet so that the thrust of the jet engine is reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTDTOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ando, Keisuke Tokyo, JP 31 41
Hirokane, Mariko Tokyo, JP 4 2
Ueno, Yoshihiko Tokyo, JP 15 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00