Horizontal multi-spindle machining center

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11247303
APP PUB NO 20210060666A1
SERIAL NO

16637147

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a machining center, and more specifically to a horizontal multi-spindle machining center, in which 2-axis (Y- and Z-axis) or 3-axis (X-, Y- and Z-axis) transfer drive units are disposed in the machining center installed to machine workpieces, in which a ram equipped with spindles is moved in the up-down, front-back, and/or left-right directions of the workpieces, in which the spindles are configured to include a plurality of spindles, i.e., 2 to 8 spindles, so that a plurality of workpieces may be machined simultaneously, and in which tool change is simultaneously performed for tools fastened to the plurality of spindles and configured to machine workpieces by using an auto tool changer (ATC), so that tool change speed may be improved and thus manufacturing efficiency may be improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNGRIM ENGINEERING CO LTD59 YEONDEOK-RO 15BEON-GIL SEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeong, Sung Il Changwon-si, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00