Fiber-fed advanced pulsed plasma thruster (FPPT)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11242844
APP PUB NO 20200032777A1
SERIAL NO

16439755

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Calculated Rating
US Family Size
Non-US Coverage

Abstract

See full text

A Fiber-fed Pulsed Plasma Thruster (FPPT) utilizes a motor to feed PTFE fiber to its discharge region, enabling high PPT propellant throughput and variable exposed fuel area. A highly parallel ceramic capacitor bank lowers system specific mass. Impulse bits (I-bits) from 0.057-0.241 mN-s have been measured on a thrust stand with a specific impulse (Isp) of 900-2400 s, representing an enhancement from state-of-the-art PPT technology. A 1 U (10 cm×10 cm×10 cm, or 1 liter) volume FPPT thruster package will provide 2900-7700 N-s total impulse, enabling 0.6-1.6 km/s delta-V for a 5 kg CubeSat. A 1 U design variation with 590 g propellant enables as much as ˜10,000 N-s and a delta-V of 2 km/s for a 5 kg CubeSat. Increasing the form factor to 2U increases propellant mass to 1.4 kg and delta-V to 10.7 km/s for an 8 kg CubeSat.

First Claim

See full text

Other Claims data not available

Family

Patent Owner(s)

  • CU AEROSPACE, LLC

International Classification(s)

loading....
  • 2019 Application Filing Year
  • B64G Class
  • 311 Applications Filed
  • 225 Patents Issued To-Date
  • 72.35 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burton, Rodney Champaign, US 7 13
Carroll, David L Champaign, US 62 369
King, Darren Champaign, US 5 1
Woodruff, Curtis Savoy, US 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 1 Citation Count
  • B64G Class
  • 80.70 % this patent is cited more than
  • 3 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges922201 - 1005101520253035404550556065707580859095100

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 8, 2033