Nano-twinned copper layer, method for manufacturing the same, and substrate comprising the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11242619
APP PUB NO 20210172086A1
SERIAL NO

17097033

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nano-twinned copper layer is disclosed, wherein over 50% of a volume of the nano-twinned copper layer comprises a plurality of columnar crystal grains, the plurality of columnar crystal grains connect to each other, at least 70% of the plurality of columnar crystal grains are formed by a plurality of nano-twins stacking in an orientation of a crystal axis, and an angle included between two adjacent columnar crystal grains is greater 20° and less than or equal to 60°. In addition, a method for manufacturing the nano-twinned copper layer and a substrate comprising the same are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEMLEADER CORPORATIONNO 4-2 GUANGFU RD HSINCHU INDUSTRIAL PARK HSINCHU COUNTY 303

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bai, Chih-Hung Hsinchu County, TW 1 1
Chen, Yao-Tsung Hsinchu County, TW 33 201
Chen, Zong-Cyuan Hsinchu County, TW 1 1
Chung, Shih-Chun Hsinchu County, TW 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00