Heat-resistant chlorine-containing crosslinked resin formed body and method for producing the same, silane master batch, master batch mixture and formed body thereof, and heat-resistant product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11242453
APP PUB NO 20180346700A1
SERIAL NO

16059266

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A production method comprising: (a) a step of melt-mixing a base resin containing a chlorinated polyethylene; an organic peroxide, an inorganic filler, and a silane coupling agent, in specific ratios, at a temperature equal to or higher than a decomposition temperature of the organic peroxide, to prepare a silane master batch; (b) a step of mixing the silane master batch obtained in the step (a) with a silanol condensation catalyst, and then forming the resultant mixture; and conducting at least one of the melt-mixing in the step (a) and the mixing in the step (b) is performed in the coexistence of a chloroprene rubber or a polyvinyl chloride; a heat-resistant chlorine-containing crosslinked resin formed body produced by the method, a silane master batch, a mixture and formed body thereof, and a heat-resistant product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FURUKAWA ELECTRIC CO LTD2-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8322

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hara, Hidekazu Tokyo, JP 27 132
Matsumura, Arifumi Tokyo, JP 17 43
Nishiguchi, Masaki Tokyo, JP 30 276

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00