High-pressure homogenizer and method for manufacturing graphene using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11242251
APP PUB NO 20190284053A1
SERIAL NO

16343059

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided a high-pressure homogenizer comprising a channel module comprising a microchannel through which an object for homogenization passes, wherein the microchannel is provided with a first flow channel and a second flow channel sequentially arranged along the direction through which the object passes, the first flow channel is provided with a plurality of first baffles disposed so as to partition the microchannel into a plurality of spaces, the second flow channel is provided with a plurality of second baffles disposed so as to partition the microchannel into a plurality of spaces, and at least one of the first baffles is provided to be positioned between two adjacent second baffles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG CHEM LTDREPUBLIC OF KOREA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Im, Ye Hoon Daejeon, KR 78 542
Kim, Eun Jeong Daejeon, KR 53 334
Kim, In Young Daejeon, KR 49 1612
Kwon, Won Jong Daejeon, KR 40 268
Yoo, Kwang Hyun Daejeon, KR 18 186

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00