Solar aided coal-fired power generation system participating in primary frequency regulation and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11236633
APP PUB NO 20210310365A1
SERIAL NO

17279569

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solar aided coal-fired power generation system participating in primary frequency regulation and a control method thereof propose a system configuration with two regulation schemes by coupling medium-low-temperature solar collectors and a coal-fired generation unit. The two regulation schemes are a high-pressure feedwater bypass scheme and a low-pressure condensate bypass scheme. The present invention formulates a primary frequency regulation control logic, so as to efficiently and accurately participate in the primary frequency regulation, thereby keeping the power grid frequency rapidly stable. The present invention also formulates a working fluid outlet temperature control logic for the solar aided coal-fired thermal system, which adjusts a heat exchange working fluid flow of the solar collectors to ensure that the temperature in each section is stable during the primary frequency regulation. The present invention uses operation matching of the turbine system and the solar collectors to improve effectiveness of the primary frequency regulation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XI'AN JIAOTONG UNIVERSITY710049 NO 28 WEST XIANNING ROAD SHAANXI XI'AN XI'AN CITY SHAANXI PROVINCE 710049

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chong, Daotong Shaanxi, CN 10 5
Liu, Ming Shaanxi, CN 547 2816
Yan, Junjie Shaanxi, CN 72 307
Zhao, Yongliang Shaanxi, CN 37 69

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 1, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00