Device and method for determining the diameter of a yarn balloon formed by a continuous yarn at a workstation of a yarn balloon forming textile machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11235945
APP PUB NO 20170217717A1
SERIAL NO

15409072

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device as well as a method for determining the diameter of a yarn balloon (B) formed by a continuous yarn at a workstation (1) of a yarn balloon forming textile machine. The workstation (1) comprises an electromagnetically functioning sensor means (33), designed and arranged in such a way that at least two interruptions of a measuring beam (42) of the sensor means (33) are caused by the yarn (5, 25) forming the yarn balloon (B) during every rotation of the yarn balloon (B) during the operation of the workstation (1), and in that the time interval between the interruptions of the measuring beam (42) can be recorded by the sensor means (33) and used for calculating the diameter of the yarn balloon (B).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAURER TECHNOLOGIES GMBH & CO KGWEESERWEG 60 KREFELD 47804

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hiepp, Magnus Kempten, DE 9 16
Pede-Vogler, Walter Durach, DE 9 23
Thaler, Alexander Burggen, DE 6 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 1, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00